Skip to content
— Process

Five movements,
one grid.

— Process

From brief to building, in five movements.

  1. 01 — Brief

    Site walks, client conversations, climate and zoning study. The project is named.

  2. 02 — Grid

    A structural and urban grid is set. Programme is laid in. The first model is physical.

  3. 03 — Form

    Mass, shade, void. Orientation is locked. Materials are sampled at full scale.

  4. 04 — Detail

    Joints, openings, thresholds. The building is drawn at 1:1 where it meets the body.

  5. 05 — Build

    On site, weekly. The drawing follows the building, not the other way around.

    Drawing follows building
— Start a project

Have a site?
We have a grid.

O+ takes on a small number of projects each year. We work on civic, residential, hospitality, and adaptive-reuse commissions — at any scale, in any phase.

Start a project
  • studio@oplus.sa
  • +966 12 000 0000
  • Al Rawdah District, Jeddah